Industry: Hospitality
Location: Michigan
Sq Ft: 6500
Type: Tear-Off and Recovery
System: Duro-Last
- Remove roofing around drain and repair bad decking and structure.
- Remove unused roof penetrations and patch in decking.
- Install one layer of recovery board underlayment to provide a smooth surface to accept the new membrane.
- Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements.
- Flash all parapet and adjacent building walls in accordance with Duro-Last fastening requirements.
- At all perimeter edges bring the membrane over the edge fastening 6” O.C.
- Install new Duro-Last metal edging on all perimeter edges.
- Flash all curbed units, stacks, chimneys, roof drains, and other penetrations.