Skip to content
Home » Portfolio Items » Cloverland

Cloverland

    Industry: Energy

    Location: Michigan

    Sq Ft: 5500

    Type: Tear-Off and Recovery

    System: Duro-Last

    20-year warranty

    • Remove and properly dispose of the existing two layers of membrane roofing leaving EPS insulation in place.
    • Install one layer of ½” ISO recovery board to provide a smooth surface to accept the new membrane.
    • Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements
    • Flash all parapet and adjacent building walls in accordance with Duro-Last requirements.
    • At all perimeter edges bring the membrane over edge fastening 6” O.C.
    • Install new Duro-Last metal edging and extension on all perimeter edges.
    • Install new metal “Z” soffit flashing along the West edge of the roof.