Holiday Inn

    Industry: Hospitality
    Location: Michigan
    Sq Ft: 9670
    Type: Tear-Off and Recovery
    System: Duro-Last

    • Remove existing coping and install new two-piece metal base.
    • Remove existing membrane leaving insulation in place.
    • Install new pitched insulation drain sets at all three roof sumps. Re-fasten loose roof sump.
    • Install one layer recovery board underlayment to provide a smooth surface to accept the new membrane.
    • Mechanically fasten the Duro-Last white, tan, gray, or dark gray single ply membrane in accordance with Duro-Last fastening requirements
    • At all perimeter edges bring the membrane over parapet wall and metal base cleat fastening 6”
    • Snap on metal edge cover on all perimeter base cleat.
    • Flash all curbed units, stacks, roof drains, and other roof penetrations in accordance with Duro-Last specifications.
    • Includes membrane on entire back side of front mansard wall