Skip to content
Home » Portfolio Items » Save A-Lot

Save A-Lot

    Industry: Department Store
    Location: Sault Ste Marie, MI
    Sq Ft: 16,000
    Type: Tear-Off and Recovery
    System: Duro-Tuff 60 mil

    • Extend back edge of roof to provide an additional 4.5” overhang.
    • Install 3” taper cut flute and fill insulation in flutes of existing metal roofing.
    • Install one layer 1 ½” ISO insulation.
    • Mechanically fasten the Duro-Last single-ply membrane in accordance with Duro-Last requirements.
    • Flash all parapet and adjacent building walls in accordance with Duro-Last fastening requirements.
    • At all perimeter edges bring the membrane over the edge fastening 6” O.C.
    • Install new Duro-Last metal edging on all perimeter edges.
    • Flash all curbed units, stacks, chimneys, roof drains, and other penetrations.